11.11.2011

PIKE received the order from ASCO Arab Steel
 
Complete news release

01.08.2011

Fulfillment of guaranteed parameters at ArcelorMittal Ostrava Steckel Mill
 
Complete news release

05.07.2011

PIKE presented 6Screens concept at METEC 2011
 
Complete news release

06.05.2011

AISTech 2011
 
Complete news release

18.02.2011

PIKE ELECTRONIC is participating in the 8th International Metallurgical Trade Fair METEC
 
Complete news release

06.01.2011

The new Variable-flow Interstand Cooling System Installed
 
Complete news release

29.09.2010

Enterprise 6Screens Framework displayed on Metal Days in Prague
 
Complete news release

15.09.2010

Invitation for Metal Days 20th-September 22, 2010 in Prague
 
Complete news release

05.09.2010

Business project HSM upgrade of variable ISC for ArcelorMittal
 
Complete news release

13.04.2010

Successful delivery for FANS, Inc.
 
Complete news release

15.12.2009

Successful finalizing of integration tests for Saldanha Steel
 
Complete news release

11.12.2009

AITISM'09 conferrence in Ranchi, India
 
Complete news release
Current news archive All | 2011 | 2010 | 2009


01.08.2011
Fulfillment of guaranteed parameters at ArcelorMittal Ostrava Steckel Mill

PIKE achieved the last guaranteed parameter "Reduction of out tolerance winding temperature at end of strip by 50% from current state" and got the acceptance.

Project included implementation of  new Strip Laser Speed Measurement and tuning of L2 laminar cooling model at ArcelorMittal Ostrava Steckel Mill. Part of implementation was also  integration between Strip Laser Speed Measurement system and Raytek System for Transverse Temperature Strip Measurement. This solution does possible accurate x,y temperature checking within the strip.





Private zone


Partners

Contact us

PIKE AUTOMATION
Jeseniova 1196/52
130 00 Prague 3
Czech Republic

Tel.: +420 271 000 700
Fax: +420 271 000 799

E-mail: pike@pikeautomation.eu

Find us on map

Webmaster Copyright © 2001-2007 PIKE AUTOMATION spol. s r.o.